1. Spot check on the delivery site quality, subcontractor qualification (check subcontractor training certificate), and EHS.
2. Perform batch spot check, output quality spot check report, and trigger acceptance.
3. Track issue improvement and closure.
4. Perform process KCP self-check at the project level and output the QC checklist.
5. Adapt the SOP in the project and promote the implementation
6. Involve in RAN site survey, design for hardware installation (indoor & outdoor installation solution) such as BBU, RRU, antenna, power, grounding installation.
7. Output site auxiliary material solution such as power cable, optical cable, grounding cable, grounding bar, mechanical antenna bracket

